摘要
本文介绍了大河口水电站导流隧洞设计优化过程及优化结果,并对导流洞建成运行后过流能力及其糙率值进行了分析。
Optimizing process of design and optimied design of diversion tunnel at Dahekou project are intro-duced in this paper. Discharging capacity and roughness of the tunnel during operation are analyzed.
出处
《四川水力发电》
1995年第1期69-72,76,共5页
Sichuan Hydropower
关键词
导流隧洞
过流能力
优化设计
衬砌
diversion tunnel optimizing process of design discharging capacity roughness