摘要
从砼灌注过程的简化力学分析着手,重点分析影响桩孔可灌性的因素,并列举了工程实例。提出了克服影响桩孔可灌性各因素的工艺技术措施。
Analysis begins with the simplified mechanics of the concrete castin g processand is focused on the factors influencing the concrete castability,with field cases taken as example.Technical measures are proposes for overcomign unfavourable factor.
出处
《探矿工程》
1995年第2期7-8,共2页
Exploration Engineering(Drilling & Tunneling)