摘要
阐述了郑州金水路立交桥基础桩工程施工中采用的主要技术装备、技术工艺和施工中几个问题的处理措施。
This paper describes the main equipment and technique employed in the foundation pile construc-tion for the overhead crossing bridge on Jinshui road in Zhengzhou and the measures taken to deal with a fewproblems in construction.
出处
《探矿工程》
1995年第4期18-20,共3页
Exploration Engineering(Drilling & Tunneling)