期刊文献+

双线自动闭塞区段列车运行延误影响分析 被引量:10

ANAL YSIS OF TRAIN RUNNING DELAY ON DOUBLE-TRACK AUTOMATIC-BLOCK SECTION
下载PDF
导出
摘要 通过对双线自动闭塞区段前后行列车运行状态的系统分析,着重研究能力利用中列车运行延误的传递特性及其传递过程中的延迟性,提出运用计算机模拟进行定量研究的方法,运用所建模拟模型,分析列车运行延误所造成的通过能力损失及其对后续列车的影响,给出了不同列车追踪间隔时分条件下,列车运行延误及其传递的有关数量指标。 In this paper, we analyse the running states of the front and back trains movingon the double-track automatic-block section. The transferring properties of train running delays in capacity utilization and the deferring states in transference are analysed emphatically.The method of computer simulation is proposed for quantitative study. Based on the computer simulation model established in the paper,the influence of capacity loss caused by thetransference of the front train running delays on the back running trains are studied quantitatively. Some results of train running delays and transference in the conditions of differenttime intervals between two trains are given out.
机构地区 北方交通大学
出处 《铁道学报》 EI CSCD 北大核心 1995年第2期9-16,共8页 Journal of the China Railway Society
基金 国家教委博士点基金
关键词 列车追踪间隔 列车运行延误 计算机模拟 能力损失 time interval between two trains train running delay computer simulation capacity loss
  • 相关文献

参考文献6

  • 1胡思继,列车运行组织及通过能力理论,1993年
  • 2胡安洲,铁道经济研究,1992年,3期
  • 3树源,铁道科技动态,1988年,3期
  • 4谢文炳,铁道科技动态,1988年,10期
  • 5李德铭,1983年
  • 6宋玉春,铁道运输与经济,1981年,5期

同被引文献57

引证文献10

二级引证文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部