摘要
西安枢纽的西安东编组站及宝鸡枢纽的宝鸡东编组站能力紧张,而西安枢纽的新丰镇编组站能力尚有待于发挥。为此,提出三个适合当前过渡阶段作业的合理调整方案,并加以论证比选。同时,提出新丰镇和西安东开往宝鸡东的区段列车编组计划调整方案以及需要解决的相关问题。
of Xi'an East Marshalling Yard of the Xi'an Terminal and the Baoji East Marshalling Yard of the Baoji Terminal is in shortage, while that of the Xinfeng TownMarshalling Yard of the Xi'an Terminal remains to bebrought into play. For this reasonl the paper put forward three reasonable adjustment programs which fit in with the current transition period operation, and made comparisons. At the same time, the paper raised the adjustment programs of marshalling plan of district trains from Xinfen Town and Xi'an East to Baoji East,and related issues needed to be solved.
出处
《铁道运输与经济》
北大核心
1995年第1期24-26,共3页
Railway Transport and Economy
关键词
列车编组计划
机车
编组站
铁路运输
枢纽
car flow concentration, marshalling plan of trains, locomotive routing.