人工挖孔灌注桩加固危房实例

An Example of Reinforcing a Dangerous Biulding by Hangdug Cast-in-situ Piles
下载PDF
导出
摘要 某小学建两层教学楼,东部二个教室位于原水塘回填较松散地基上。后由二层加到四层。加层使用一年半后就发现东头北面墙体开裂。九四年三月又发现增加了两处新的裂缝,八个教室停止使用。本文分析了裂缝产生原因。经采用人工控孔灌注桩加固,裂缝稳定,变形得到控制。 The two classrooms on the eastern part of a two-storey primary school building is located on soft ground filled up in a pool. The building was then raised from two storeys to four storeys. One and hale year later, cracks appeared on the northern wall at the east end of the building. In March 1994 two new aracks were discovered, eight classrooms consequently were shut down for schooling. In this paper, the causes of cracking are analysised and handdug cast-in-situ piles were adopted for remedy so that the developing of cracks were halted and the deformation of the building was under controlled.
机构地区 中南勘察设计院
出处 《土工基础》 1995年第1期15-18,共4页 Soil Engineering and Foundation
关键词 人工挖孔 灌注桩 加固 承载力 危房屋 Handdug cast-in-situ pile Deformation remedy Bearing capacity
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部