摘要
介绍了深(圳)-汕(头)汽车专用公路后门隧道监控工程的土建预留预埋施工情况,并就施工中出现的诸如管路堵塞等问题从施工组织、施工工艺、施工要声、等方面进行了剖析、研究。最后就如何保证施工顺利、减少返工,从设计、监理等方面提出了需要完善、加强的措施。
The civil pre-reserving and pre-burying construction for Houmen tunnel supervision control engineering on Shenzhou-Shanton special automoile highway are intro-duced, and the problems in construction, such as pipeline jam etc, are analyzed in the viewof construction organization technology, gist aspects. Measures are presented in design andsupervisory aspects so as to construct smoothly and reduce doing over again.
出处
《西安公路交通大学学报》
CSCD
北大核心
1995年第3期37-42,共6页
Journal of Xi'an Highway University
关键词
隧道
洞室
管路
监控工程
土建预留
unnel, hole chamber, pipeline, construction gist, engineering measure