汤峪水电站调压阀运行可靠性分析

An Analysis of the Operational Reliability of the Pressure Regulating Valve at Tangyu Water Power Station
下载PDF
导出
摘要 通过对汤峪水电站的计算分析,确定当导叶无分段关闭装置时,调压阀流量为1.7m ̄3/s,行程52mm,导叶快关闭时间1.99s,导叶慢关闭时间17.89s;当导叶设有分段关闭装置时,调压阀流量为1.44m ̄3/s,行程44mm,导叶第一段关闭时间1.8s,导叶两段关闭总时间4.42s,即能满足要求。 By means of calculation and analysis at Tangyu Water Power Station,some regulated parameters weredetermined. When the guide vane was not installed withstage-closing devices,the flow rate of pressure regulating valve was 1.7m ̄3/s,and thetravelwas 52 mm with. 99 s for the fast closing time of the guide vane and 17.89 s forthe slow closing time;when the guide vane and operated with stage-closing devices, theflow rate of the pressure regulating valve was 1. 44 m ̄3/s,and the travel was 44 mm with1.8 s and 4.42 s for the total closing time of the two stages. Both ways could meet thedesign requirements
出处 《西北农业大学学报》 CSCD 1995年第3期63-68,共6页 Journal of Northwest Sci-Tech University of Agriculture and Forestry(Natural Science Edition)
关键词 水电站 压力管道 调压阀 调节参数 调节保证计算 wager power station,pressure pipeline,pressure regulating valve,regu-lated parameters ,calculation of regulation and guarantee
  • 相关文献

参考文献1

  • 1王世泽.水电站建筑物[M]水利电力出版社,1987.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部