摘要
金川镍矿通过二十多年的生产实践与科研工作,在矿岩特别破碎、地压很大的条件下,全面积3~5万m2的大面积矿体,连续应用下向胶结充填采矿法开采,取得了成功。作者对二期工作大面积开采范围的矿柱留设,开采顺序,多阶段开采问题,通过矿岩稳定性分析提出了具体意见。
Through twenty year practise and re-search ,the mining of downward cementing filling ina large area of 30~50 thousand m2,especially underextremely fragmnting and high pressure conditions,gain the success. The details of the suggestion wereputforward by stability analysis concerning the in-stallation of ore pillar,mining sequence and multiplestage mining。
出处
《西部探矿工程》
CAS
1995年第3期4-7,共4页
West-China Exploration Engineering