摘要
通过试验分析,金竹山电厂50WM机组可采用启停调峰运行方式;提出了一些改进方法和措施;找出了最佳的启停方案。
After tbe study of the test,the pa-per puts forward the idea that the on-off load-adjustment operation can be applied to the 50MWgenerators in Jin Zhu Shan Power Plant,and thepaper also makes some suggestions of the waysand measures of the improvement.The paper sug-gests the best an-off operation way.
关键词
汽轮机组
锅炉
调峰
发电厂
Turbagenerater,Furnace,Load ad-justmemt