铀矿冶设施退役工作程序可分为3个阶段:前期准备、现场施工、竣工验收。文中着重对前期准备进行了详细的论述,还提出了做好退役工作必须加强领导、健全机构的措施。
The procedure of decommissioning work of uranium mine and mill facilities includes threestages: preparation,on-the-spot construction and acceptance after being completed. The first stagepreparation is discussed in detail in this paper,and it is presented to take the measures ofstrengthening leadership and improving leading they to conduct the decommissioning work best.
出处
《铀矿冶》
CAS
1995年第3期158-162,共5页
Uranium Mining and Metallurgy
关键词
铀矿冶
设施
退役
工作程序
环境管理
Uranium mining and mill facility Decommissioning Procedure of work