摘要
本文介绍了国际工程承包合同中有关调价的公式、适用条件、方法及应注意的问题。
The article introduces some formulas for price adjustment during the performance of foreign engineering contracts,including the spheres and methods of their application,as well as some other related issues whcih calls for attention.
出处
《中国地质矿产经济》
1995年第5期45-47,共3页
China Geology & Mining Economics