摘要 实际生产中的配合加工调度问题是生产调度理论研究的一个难点,它既要考虑常规调度标准约束,还要考虑工件与工件之间的配合工序约束。以最短加工时间为目标函数,建立配合加工调度模型,并采用启发式倒排算法对其进行求解。该算法能有效保证工件交货期,最后以一个实例验证算法的有效性。 Job shop scheduling problem of matching machining is a difficulty in the field of scheduling theory research.It not only considers general constraint but also mathcing operation constraint of related jobs.A mathematical model of the problem whose objective is to minimize the overall completion time is established.The backward heuristic scheduling algorithm is adopted to solve the model.It assures the delivery time.An example is illustrated to verify the effectiveness of algorithm.
出处 《机械设计与制造》 北大核心 2010年第12期52-54,共3页 Machinery Design & Manufacture
基金 广州市科技计划项目-"全柔性化CAD/CAPP/CAPPS集成系统"推广应用(2007C13G0021) 广东工业大学校青年基金-配合加工条件下的车间调度模型的研究及建立
  • 相关文献

参考文献6

二级参考文献35

  • 1袁晓光,王作江,刘建军,韩铁.后腹腔镜肾癌根治术治疗T2期肾癌临床疗效观察[J].中国肿瘤临床与康复,2020,0(2):211-213. 被引量:8
  • 2张道远,陆正,陆伟,杜素花,班德文.单孔与传统后腹腔镜肾癌根治术的比较研究[J].临床泌尿外科杂志,2020,0(3):220-223. 被引量:7
  • 3王笑蓉,吴铁军.基于Petri网仿真的柔性生产调度——蚁群-遗传递阶进化优化方法[J].浙江大学学报(工学版),2004,38(3):286-291. 被引量:18
  • 4[1]Lee C.Y.,Cheng T.C.E.,Lin B.M.T.,Minimizing the Make~m in the 3 Machine Assembly Type Flow shop Scheduling problem,Man-agement science,1993,39,615-625.
  • 5[2]Pougcharoen P.,Hicks C.,Brainden P.M.,Determining optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and As-sembly of complex products,International Journal of Production Economics,2002,78,311-322.
  • 6[3]Dabbas,R.M.,H.N.Chen,J.W.Fowler and D.Shunk,A Combined Dispatching Criteria Approach to Scheduling Semiconductou Manu-factoring System,Computer and Industrial Engineering,2001,39,307-324.
  • 7[4]Adam N.R.,Bertrand J.W.M.,Morehead D.C.And Surkis J.,Date Assignment Procedure with Dynamically Updated? Coefficients for Multi-level Assembly Job-Shops,European Journal of Operational Research,1993,68,212-227.
  • 8[5]Hanpt,R.,A Storey of Priority Rule-based Scheduling,OR Spektrum,1989,11,3-16.
  • 9[6]Philipoom P.R.,Rrussell,R.S.And Fry T.D.,A Preliminary Investigatiou of Multi-attribute Based Sequencing Rules for Assembly Shops,International Journal of Production Research,1991,29,739-753.
  • 10玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..

共引文献120

同被引文献4

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部