资源约束项目计划内在稳健性度量方法 被引量:2

Measures for Intrinsic Robustness of Resource-constrained Project Schedules
下载PDF
导出
摘要 分析了项目计划稳健性的研究现状,提出了10种新的内在稳健性度量指标,在关键序列优化的基础上仿真试验了内在稳健性度量指标,内在稳健性度量指标可正确预测和比较项目计划的内在稳健性,为制定稳健性高的项目计划提供定量分析依据。 The current situation of project schedule robustness is analyzed and ten kinds of measure indices for intrinsic robustness are proposed in this paper.On the basis of critical sequence optimization,the intrinsic robustness measures are verified by simulation test.The simulated results show that these indices can correctly predict and compare the intrinsic robustness of different project schedules,which provides quantitative analysis basis for project schedule with high robustness.
出处 《水电能源科学》 北大核心 2010年第8期123-125,共3页 Water Resources and Power
基金 中国博士后科学基金资助项目(20070420922) 国家自然科学基金资助项目(60574071) 广西壮族自治区教育厅科研基金资助项目(200712LX128) 广西民族大学引进人才科研启动基金资助项目(200702YZ01)
关键词 资源约束 项目计划 稳健性 度量方法 度量指标 研究现状 序列优化 定量分析 仿真试验 预测 基础 resource constraints project schedule intrinsic robustness critical sequence measure
  • 相关文献

参考文献9

  • 1崔万安,王先甲.资源约束项目计划关键序列与内在稳健性关系[J].水电能源科学,2010,28(7):127-129. 被引量:3
  • 2Cui Wanan,Wang Xianjia.Links Optimization forResource Constrained Project Scheduling. 2008International Conference on Computer Science andSoftware Engineering . 2008
  • 3Hédi Chtourou,Mohamed Haouari.A Two-stage-priority-rule-based Algorithm for Robust Resource-constrained Project Scheduling. Computers andIndustrial Engineering . 2008
  • 4Hartmann,S.,Kolisch,R.Experimental Evaluation of State-of-the-Art Heuristics for the Resource-Constrained Project Scheduling Problem. European Journal of Operational Research . 2000
  • 5Wiest J. D.Some properties of schedules for large projects with limited resources. Operations Research . 1964
  • 6KIM K,DE LA GARZA J M.Phantom float. Journal ofConstruction Engineering and Management . 2003
  • 7Al-Fawzan,M. A.,Haouari,M.A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics . 2005
  • 8Kolisch R,Sprecher A.PSPLIB - a project scheduling problem library. European Journal of Operational Research . 1997
  • 9Li K Y,Willis R J.An iterative scheduling tech-nique for resource constrained project scheduling. European Journal of Operational Research . 1992

二级参考文献14

  • 1Van de Vonder Stijn,Demeulemeester Erik,Herro-elen Willy,et al.The Trade-off Between Stabilityand Makespan in Resource-constrained ProjectScheduling. International Journal of ProductionResearch . 2006
  • 2Przemyslaw Kobylański,,Dorota Kuchta.A Note on thePaper by M.A.Al-Fawzan and M.Haouari about a Bi-objective Problem for Robust Resource-constrained Pro-ject Scheduling. International Journal of ProductionEconomics . 2007
  • 3Hédi Chtourou,Mohamed Haouari.A two-stage-priori-ty-rule-based Algorithm for Robust Resource-constrainedProject Scheduling. Computers&Industrial Engi-neering . 2008
  • 4Cui Wanan,Wang Qianzhen,Cao Xiuning.LinksOptimization for Resource Constrained ProjectScheduling. 2008 International Conference onComputer Science and Software Engineering . 2008
  • 5Yang Kum-Khiong.A Comparison of Dispatching Rulesfor Executing a Resource-constraint Project with EstimatedActivity Durations. Omega . 1998
  • 6Barbara G Tabachnik,Linda S Fidell.Using MmultivariateStatistics. . 2006
  • 7Hartmann Sonke,Kolisch Rainer.Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research . 2000
  • 8Al-Fawzan,M. A.,Haouari,M.A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics . 2005
  • 9Goldratt EM.Critical Chain. . 1997
  • 10Wiest J. D.Some properties of schedules for large projects with limited resources. Operations Research . 1964

共引文献2

同被引文献32

  • 1崔万安,王先甲.资源约束项目计划关键序列与内在稳健性关系[J].水电能源科学,2010,28(7):127-129. 被引量:3
  • 2卢纹岱.SPSS统计分析[M].北京:电子工业出版社,2012.
  • 3Wiest J. D. Some properties of schedules for large pro- jects with limited resources[J]. Operations Research, 1964,12(3) :395-418.
  • 4Stijn Van de Vonder, Erik Demeulemeester, Willy Her- roelen and Roel Leus. The trade-off between stability and makespan in resource-constrained project schedu ling[J]. International Journal of Production Research, 2006,44(2) :215-236.
  • 5Herroelen, Willy; De Reyck, Bert ; Demeulemeester, Erik, Resource-constrained project scheduling: A survey of re- cent developments[J]. Computers and Operations Re- search, 1998,25(4) : 279-302.
  • 6Brucker, Peter ; Drexl, Andreas ; M6hring, Rolf; Neu- mann, Klaus; Pesch, Erwin ; Resource-constrained pro- ject scheduling: Notation, classification, models, and methods [J]. European Journal of Operational Re- search, 1999,112(1) :3-41.
  • 7Hartmann, S6nke and Koliseh, Rainer, Experimental e- valuation of state-of-the-art heuristics for resource con- strained project scheduling[J]. European Journal for Operational Research, 2000 (127) : 394-407.
  • 8Kolisch,R and Padman, R, An integrated survey of de- terministic project scheduling[J]. Omega, 2001,29 ( 3 ) : 249-272.
  • 9Herroden,Willy; Demeulemeester, Erik; De Reyck, Bert, A note on the paper "Resource-constrained project schedu- ling: Notation, classification, models and methods" by Brucker et al[J]. European Journal of Operational Re- search, 2001,128(3) : 679-688.
  • 10M. A. A1-Fawzan and Mohamed Haouari. A bi-objective model for robust resource-constrained project scheduling[J]. International Journal of Production Economics, 2005, 96(2) : 175-187.

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部