伊洛瓦底江上游电源电站孤网运行探讨 被引量:5

Discuss on the Isolated Operation of Power Station for the Hydropower Development of Irrawady River Upper Reach
下载PDF
导出
摘要 针对缅甸伊洛瓦底江上游梯级电站电源电站孤网运行的特点,结合电源电站自身的出力特性和供电期间的缺口电量分析,认为采取实行施工错峰用电,用柴油发电机作为备用电源,增设功率平衡器,配置安全稳定装置等措施可适当解决电网中存在的问题。 The power station for supplying power to the hydropower development project construction of Irrawady River in Burma is isolated operation.Based on the outlet characteristics and the power supplying gap of power station,the measures including constructing in different peak load period,using diesel generators as backup power,and installing additional power balancer and stability controller are applied.The problems of the isolated power grid are solved.
出处 《水力发电》 北大核心 2010年第12期69-71,87,共4页 Water Power