摘要
马钢二铁总厂1#高炉热风炉通过对操作及热源方面的管理和技术改造实现提高风温,满足了高炉强化冶炼的需要。
Blast temperature was increased through management and technical reform of the hot stove at the No.1 blast furnace of Masteel's No.2 Ironmaking Works,to meet the requirement of intensified ironmaking operation.
出处
《安徽冶金》
2011年第4期14-15,共2页
Anhui Metallurgy
关键词
高炉
热风炉
热风温度
blast furnace hot stove hot air temperature