摘要 从线路布置、检查坑形式、车顶作业平台设置等方面,阐述北京地铁八通线土桥车辆段停车列检库工艺设计的特点,在满足列车停放和检查功能的情况下,库内设施、设备的配置尽量精简,应压缩规模、节省投资,并充分体现以人为本。 From the views of line layout, the form of inspection pit and the working platform for the top works of train, the technological characteristics of the design of garage for train parking and inspecting in Tuqiao Depot of Beijing Metro Batong Line are discussed. The equipment and facilities in the garage should be reduced and the investment should be retrenched on the basis of satisfying the demand of train parking and inspecting. The design should follow the ideas of focusing on human and employing advanced technologies.
作者 高莉萍
出处 《都市快轨交通》 2005年第4期97-100,共4页 Urban Rapid Rail Transit
关键词 车辆段 车辆 停放 列检 检查坑 土桥车辆段 工艺设计 北京地铁 停车 线路布置 depot train parking inspecting of train inspection pit
  • 相关文献

参考文献5

  • 1北京城建设计研究院.地铁八通线工程施工设计[G].北京,2002..
  • 2北京城建设计研究院.地铁复八线施工设计文件[G].北京,1999..
  • 3北京城建设计研究院.地铁八通线工程初步设计[G].北京,1998..
  • 4北京城建设计研究院.上海龙东路停车场施工设计[G].北京,1997..
  • 5肖瑞金.国外地铁车辆段的设计和车辆维修设施[J].都市快轨交通,2005,18(1):75-79. 被引量:18

共引文献17

同被引文献35

引证文献9

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部