从线路布置、检查坑形式、车顶作业平台设置等方面,阐述北京地铁八通线土桥车辆段停车列检库工艺设计的特点,在满足列车停放和检查功能的情况下,库内设施、设备的配置尽量精简,应压缩规模、节省投资,并充分体现以人为本。
From the views of line layout, the form of inspection pit and the working platform for the top works of train, the technological characteristics of the design of garage for train parking and inspecting in Tuqiao Depot of Beijing Metro Batong Line are discussed. The equipment and facilities in the garage should be reduced and the investment should be retrenched on the basis of satisfying the demand of train parking and inspecting. The design should follow the ideas of focusing on human and employing advanced technologies.