摘要
本论文应用模糊数学理论,将模糊综合评价方法引入电力企业项目的可行性评价,并结合项目可行性实践经验,提出了电力企业项目可行性评价的一种新思路———分析电力项目可行性评价的影响因素,对项目的可行性进行模糊综合评价,得出项目是否可行的结论。应用实例表明:电力项目模糊综合评价方法可操作性强、效果较好,可在一般电力项目可行性评价中广泛应用。
In this paper, based on fuzzy mathematics theory, applying the method of fuzzy comprehensive evaluation into the electric power project feasibility evaluation, and with the experience of practical item, advancing a new train of thought--analyzing the factors of evaluating electric power project feasibility to evaluate the project by fuzzy comprehensive evaluation, and getting the result, the factors of evaluating electric power project feasibility. The applying example indicates: the assessment is feasible and effective; it can be used widely in the electric power projoect feasibility evaluation.
出处
《华北电力大学学报(社会科学版)》
2005年第3期46-50,共5页
Journal of North China Electric Power University(Social Sciences)
关键词
电力
可行性
评价
层次分析法
模糊综合评价
electric power
feasibility
evaluate
analytical hierarchy process
fuzzy comprehensive evaluation