摘要
根据边坡工程地质和水文地质条件及滑坡现状,采用极限平衡分析SLOPE软件对边坡开挖现状,两个削坡方案进行了稳定性分析,为边坡治理方案的确定提供了依据,最终确定了该矿边坡削坡的技术方案,矿山采用该方案正在实施过程中。
Based on the engineering geology and hydrological condition and rock slope landslide status, with slope stability analysis software Slope 2000, stability of the excavated rock slope and of the two technique scheme are analyzed, this provided for the basis of reinforcement works, in the end, the technique scheme of harness project for slope landslide is determined, and it has been putting into practice by the scheme.
出处
《中国矿业》
北大核心
2005年第8期56-58,共3页
China Mining Magazine
关键词
露天矿
边坡
稳定性
治理
SLOPE
Open pit mine Rock slope Harness scheme Slope stability