三峡左岸电站VGS机组盘车及总装工艺改进

Improvements on axis alignment and assembly process of VGS units for Three Gorges Left Powerhouse
下载PDF
导出
摘要 简介三峡VGS机组总装及盘车工艺的特点及其应用与改进,为后续机组的施工提供借鉴。 Fourteen generating units are installed in the left bank powerhouse of Three Gorges Hydropower Station. Six of them are made by the joint venture of VOITH, GE and SIEMENS. In unit assembling and aligning processes, many significant technical improvements are made for adapted to the site construction. The period of the unit installation has been shortened.
出处 《水电站机电技术》 2005年第4期1-2,12,共3页 Mechanical & Electrical Technique of Hydropower Station
关键词 三峡 VGS机组 总装及盘车 工艺改进 Three Gorges VGS units assembly and alignment technical improvement