摘要
本文论述了火力发电厂输煤栈桥的新设计,对台山发电厂一期1号,2号机组C9栈桥柱采用钢管结构设计,取得了很好的技术经济和视觉效果。
This paper presents an innovative design concept of coal - transfer - trestles for coal - fueled power plants. By introducing steel tubes to the structural design of the C9 Trestle of Taishan Coal - fu- eled Power Plant (unit 1 & 2), it demonstrates considerable technical, economical and visual effects.
出处
《电力勘测设计》
2005年第4期44-46,54,共4页
Electric Power Survey & Design
关键词
输煤栈桥
钢管结构
新设计
coal - transfer - trestles
steel tube structures
new design