摘要
讨论了重庆跨座式单轨胶轮交通系统预应力混凝土轨道梁的运输与架设方案。经过多种方案的比较和分析, 认为运梁车,架桥机施工方案为最佳。对该方案的基本原理和方法进行阐述,提出了架桥机、运梁车设计中应解决的问题以及应用中的优化措施。
Taking the transportation and installation of the PC truck beam in Chongqing straddle monorail system as an example, this paper compares different projects, argues the bridge girder - erecting has been proved to be the best. The author then explains the basic principle of this project and lists problems to be settled while designing the bridge girder - erecting machine and girder vehicle. Finally, the author holds that this project has good social economic benefits and usefal experiences for domestic and international straddle type monorail transportation systems.
出处
《城市轨道交通研究》
2005年第4期50-52,共3页
Urban Mass Transit