摘要
针对重庆朝阳气体有限公司新建18000m3/h制氧机工程,从方案选型、设备招标、优化工程建设等方面,介绍了整个制氧机工程建设情况,全面控制了工程投资。
Based on plan selection, inviting tenders of plants optimizing engineering construction, the overall engineering construction of the newly built 18000m^3/h air separator of Chongqing Chaoyang Gas Co., Ltd. is presented so as to control the engineering investment
出处
《冶金动力》
2005年第4期29-31,37,共4页
Metallurgical Power
关键词
制氧机
优化
投资
air separator
optimization
investment