摘要
2002年~2004年,新钢各高炉共耗用含钛炉料33105 t,其中钛渣6353 t,占19.19%.使用含钛炉料护炉为晚期高炉安全高效生产提供了技术手段.
The issue of selecting titanium ore and making the acquaintance to protect furnace operation under Xin Steel smelting condition. From 2002 to 2004, total of 33105 tons' s titanium ore were used in Xin Stel blast furnaces, the titanium slag weight was 6353 tons, it only was 19.19 precent. The fumances obtained high efficacy and security output at it were later stages of campaign through some technical measures, such as addition of titanium are and slag for BF protection.
出处
《四川冶金》
CAS
2005年第5期37-39,共3页
Sichuan Metallurgy