摘要
对冬瓜山铜矿多级机站通风系统存在的问题进行了分析研究,并提出了解决办法.实践证明:优化后的通风系统既满足了井下通风需要,又获得了良好的经济和社会效益.
The paper studies the current problem of the ventilation system of Dongguashan Copper Mine, and puts forward the measure to deal with it, the optimum method is proved to meet the demands of underground ventilating and brings good social and economical benefits.
出处
《南方冶金学院学报》
2005年第4期10-14,共5页
Journal of Southern Institute of Metallurgy
关键词
多级机站
通风系统
井巷局阻
multi-level station
ventilation system
workings' partial resistance