摘要
主要对国内设计制造生产的大型循环流化床锅炉运行情况进行了介绍,并结合设备的实际运行状况、存在的问题及改进完善措施进行了分析总结。
This paper introduces the operation of large CFB boilers, which are designed and produced in China, and analyzes and summarizes equipment's actual operating conditions, existing problems and consummating measures.
出处
《河北电力技术》
2005年第4期23-26,共4页
Hebei Electric Power