摘要
分析了目前国内在XLPE交联电缆交接试验中存在的问题,从设备和标准上论述了变频谐振装置在进行高压电力电缆现场交流耐压的可行性.
This paper analyzes problems existing in hand-over experiment of XLPE linkage cable, and treatises feasibility of using frequency change resonance unit to conduct high-voltage electric power cable on-the-spot AC voltage withstanding.
出处
《电工技术》
2005年第8期55-56,共2页
Electric Engineering