通过对莲花水电站1号引水隧洞补强加固工程中混凝土表面保护砂浆的性价比分析,选用H K砂浆可满足隧洞的抗冲磨要求,而且施工简便,工程造价低。
This article has compared the performance and price of mortar which used in concrete surface protection in reinforcing the water tunnel No.1 in Lotus hydropower station. The selection of HK meets the requirement of abrasive resistance, and it is satisfactory with the convenient construction and lower cost.
出处
《大坝与安全》
2005年第4期62-63,共2页
Dam & Safety
关键词
引水隧洞
混凝土修补
HK砂浆
莲花水电站
water tunnel, concrete repair, HK mortar, Lotus hydropower station