摘要
介绍了栖霞市山城金矿Ⅷ号脉矿区开拓状况和深部开拓方案,通过深部开拓方案的研究,以现有提升系统为基础,确定了提升系统技术改造方案。
This article introduces the present development conditions and the deep development situation of Ⅷ mining area in Shancheng Gold Mine. Based on the research of deep development plan and present hoisting system situation, the technical transformation plan of hoisting system was determined.
出处
《中国矿山工程》
2005年第4期23-24,共2页
China Mine Engineering
关键词
深部开拓
提升系统
技术改造
deep development
hoisting system
technical transformation