摘要
简要介绍75 m跨连续箱梁预拱度设计、箱梁节段预制高精度几何线型控制技术和几何数据采集及控制,说明预制箱梁时预制单元的定位,几何控制测点的布置及测量容许误差控制指导原则以及预制过程中的误差调整方法。
The authors describe in their paper the design of the pre-camber of the 75-m long continuous box girders, the geometric linear technique to control the precision of precasting of segments of the box girders and the collection and control of geometric data. The authors also illustrate the setting of the precasting segments, arrangement of geometric reference points and the guiding principle for controlling the allowable error in surveys as well as the methods for compensation and correction of error during the prefabrication of the box girders.
出处
《中国港湾建设》
北大核心
2005年第4期50-54,共5页
China Harbour Engineering
关键词
苏通大桥
预拱度
箱梁节段
短线匹配
几何线型控制
误差调整
Suzhou-Nantong Bridge
precamber box girder segment
stub matching
geometrical linear control
compensation of error