摘要
通过分析西部经济不发达地区,以BOT方式建设中小型水电站的可行性,探讨了政府在此领域应采取的相应政策和应注意的问题,提出在西部地区用BOT方式建设中小型水电站是西部大开发的有力支撑之一。
By analysising the feasibility of building the medium - sized and small - sized water- electricity station in the west region of china by BOT model, this paper studys the policies the government shall adopt and the problems the government shall care for,and brings up building the medium- sized and small - sized water- electricity station by tiffs model is the important supporting of the West - Develop men.
出处
《水利科技与经济》
2005年第4期243-245,共3页
Water Conservancy Science and Technology and Economy
关键词
中小型水电站
BOT
西部大开发
the medium - sized and small - sized water - electricity station
BOT
West - Development