期刊文献+

洪家渡水电站施工期水情预报服务

Service of Regime Forecast During Construction Period of Hongjiadu Hydropower Station
下载PDF
导出
摘要 洪家渡水电站3台机组于2004年全部发电,施工期水情预报服务工作历时5年。本文从水情自动测报系统遥测站网规划和施工期洪水预报方案论证、施工期专用测站建设和改造、施工期水情预报服务及其效果等方面,对这5年的工作进行了回顾和总结。 Service of regime forecast during construction period lasted 5 years until 3 units of Hongjiadu Hydropower Station were put into operation in 2004. The article has reviewed and summarized the works of those 5 years from some view points such as expounding and proving the planning of remote measuring stations of automatic regime supervision system and the scheme of forecast flood during construction period, construction and reform of some station special for construction period, service and results of regime forecast during construction, and etc.
作者 叶绪纲
出处 《贵州水力发电》 2005年第4期36-40,共5页 Guizhou Water Power
关键词 防洪工程 施工期水情预报服务 遥测站网规划 测站建设和改造 洪水预报方案论证 水情服务效果 洪家渡水电站 flood control engineering, service of regime forecast during construction period,construction and reform of measuring station, expounding and proving of flood forecast scheme, effect of regime,Hongjiadu Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部