摘要 阐述了贵州乌江洪家渡水电站厂房上部新型钢结构排架柱、吊车梁负荷试验时的变形、振动的观测方法与结果,并对结果进行了分析处理。试验结果表明:洪家渡水电站厂房排架柱、吊车梁负荷试验时的变形位移值及振动频谱分析最大振幅值都在设计容许范围之内,从而证明该新型结构在水电站的推广价值。 This article introduces the methods and results of observing vibration and deformation of crane beams and framed columns-steel structures on the top of powerhouse when them were in load test, as well as analyzes the results. The results of the test made known that the values of deformation and vibration of the crane beams and framed columns of Hongjiadu Hydropower Station powerhouse when they in load test are in the scope of design permission. This proves that the new structure has value of popularity in hydropower station construction.
出处 《贵州水力发电》 2005年第4期84-88,共5页 Guizhou Water Power
关键词 水工结构 钢结构排架柱 吊车梁变形 振动 观测 洪家渡水电站 hydraulic structure, framed column of steel structure, deformation of crane beam, vibration, observation, Hongjiadu Hydropower Station

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部