摘要
在烟气脱硫项目中,采用EPC或EP+C的总承包建设模式比较普遍,广州市瑞明电厂烟气脱硫项目由广东省电力设计研究院EPC总承包,负责设计、采购、施工、调试全过程,特别是在施工管理上开创了新的思路并取得了成功。
Now EPC or EP+C mode is popular in FGD project. The FGD project of Guangzhou Ruiming Power Station was EPC contracted by Guangdong Electric Power Design Institute. The EPC contractor was responsible for design, procurement, construction and commissioning. The project was successful.
出处
《电力环境保护》
2005年第3期6-8,共3页
Electric Power Environmental Protection