摘要
通过对法国Cognac桥的介绍,简述了波形钢腹板PC组合梁桥的构造和施工方法,介绍了我国在建的波形钢腹板PC连续箱梁桥——长征桥的主梁结构,波形钢腹板和剪力连接设计与加工,以及桥梁的施工过程。
The French Cognac bridge is introduced to describe the structure and the construction methods of the PC composite box-girder bridge with the corrugated steel webs. The superstructure of Long-March footbridge, which is the first PC composite continuous box-girder footbridge with the corrugated steel webs in China, is introduced. Design and the construction method of the footbridge is discussed.
出处
《黑龙江工程学院学报》
CAS
2005年第3期35-38,共4页
Journal of Heilongjiang Institute of Technology
基金
国家自然科学基金资助项目(50078014)
关键词
波形钢腹板
PC组合连续箱粱
人行桥
结构设计
corrugated steel webs
PC composite continuous box-girder
footbridge
structural design