摘要
对某一商业烂尾楼改、扩建工程设计过程进行了简要介绍,结合实测资料,对碳纤维布粘贴加固、后浇带的设置及新、旧部分之间的交接进行了论述,经实践证明,整个设计和施工都是成功的。
According to one long-drawn-out and uncompleted commercial building its reconstruction and extension design are briefly introduced. Combined with on-site measurement the reinforcement treatment with carbon fiber sheet, the setting of late poured band and the connection between young and old parts are discussed. Practice acquired good effects.
出处
《山西建筑》
2005年第18期64-65,共2页
Shanxi Architecture
关键词
烂尾楼
碳纤维加固
后浇带
应力滞后
long-drawn-out and uncompleted building, reinforcement treatment with carbon fiber sheet, late poured band, stress lagging