摘要
结合具体的工程实例,对12m跨厂房排架柱结构施工要领作了探讨,从轴线标高控制、柱墙连接、钢筋工程方面,介绍了结构施工方面的实践经验,并提出一些应注意的事项。
Combined with specific project, it discusses structural construction of bent pole in 12 m span factory building, experiences of structural construction are introduced from axial level control.connection between pole with wall and reinforcement engineering, and putts forward matters need attention.
出处
《山西建筑》
2005年第16期142-142,共1页
Shanxi Architecture
关键词
结构施工
钢筋工程
混凝土工程
structural construction, reinforcement engineering, concrete engineering