竖井变形破坏机理与对策研究 被引量:8

THE RESEARCH ON THE DEFORMATION MECHANISM AND COUNTERMEASURE OF SHAFT FAILURE
下载PDF
导出
摘要 在竖井变形破坏工程调查基础上,从徐淮地区地质背景和工程动力特性出发,论述了人类工程活动与地质环境相互作用的关系;提出了该地区竖井非采动变形破坏的区域性、滞后性和层控性三大特点。根据竖井破坏形态、时、空展布特征和动力学过程,并依据不同特征提出了徐淮地区竖井变形破坏“三因素综合破坏”观点,即地质体薄弱部位、负摩擦力和水平荷载的综合作用。还进行了竖井变形破坏动力学过程的物理模拟实验和三维线弹性、弹塑性数值模拟分析,对矿区初始地应力场和竖井与围土(岩)二次应力场,即地层失水沉降作用下,或水平地应力作用下,或失水沉降与水平地应力及重力共同作用下,研究土体浅部和深部变形时土岩与井壁的相互作用,揭示了徐淮地区竖井变形破坏的机理。另外,在系统科学理论指导下,结合徐州张小楼千米竖井工程实例,从六个方面开展了竖井变形破坏规律及对策研究,为防治竖井失稳提出了可靠的途径。 Based on a thorough review of previous papers and in-situ investigation, aiming to reveal the relationship between human engineering activities and geo-environment on a certain geological and engineering geological background,the author has done his research on a special kind of shaft deformation and failure occurring nearby the interface of alluviumand bedrock in some coal mines in Xuhuai Area.southeast China.In the first part of thepaper, some characteristics of the deformation and failure,such as morphological features, chronological features, and spatial distribution, are discussed in order to illustratequalitatively the mechanism of the deformation and failure. The author ascribed the shaftdeformation and failure to a complex contribution of three factors.namely geological weakposition, negative friction and horizontal loading.The second part of the paper concernsthe physical and numerical modeling which has been used to verify the above-mentionedmechanism. Stress distribution of the shaft and the interaction between the shaft engineering and its surrounding geological media are analyzed with 3D elastic as well as elasto--plastic models under various conditions.In the last part,taking a shaft of Zhangxiaolou coalmine, which is 1000 meters deep.as an example,and according to the theory of Engineering Geomechanics and system Engineering, the author has proposed his integrated countermeasure for the special shaft deformation and failure in 6 aspects.
作者 毕思文
出处 《地学前缘》 EI CAS CSCD 1996年第1期111-118,共8页 Earth Science Frontiers
基金 中国煤炭系统"八五"攻关科研课题资助
关键词 竖井井筒 变形 破坏机理 对策 矿井 shaft deformation and failure geo-environment engineering dynamic action comprehensive deformation and failure by three factors physical and numerical modeling integrated countermeasure
  • 相关文献

参考文献15

  • 1李文平,工程地质学报,1995年,1卷,45页
  • 2毕思文,中国科学院地质研究所工程地质力学开放研究实验室年报,1995年
  • 3王思敬,典型人类工程活动与地质环境相互作用研究.2,1995年
  • 4毕思文,博士学位论文,1995年
  • 5周治安,安徽地质,1993年,1卷,59页
  • 6毕思文,中国科学院地质研究所工程地质力学开放研究实验室年报,1993年
  • 7楼向东,中国科学院地质研究所工程地质力学开放研究实验室年报,1993年
  • 8毕思文,第二届全国工程地质力学青年学术讨论会论文集,1992年
  • 9朱作砺,第四届全国工程地质大会论文集,1992年
  • 10张建怡,煤炭科学技术,1992年,2卷,31页

同被引文献17

引证文献8

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部