摘要
通过3 5 0MW 2台锅炉过热器、再热器的改造实践,给出了锅炉受热面改造过程中钢管材料选择及设计计算、制造、安装过程中应注意的问题。
Problems, to be heeded during retrofit of heat delivery surfaces in respect to choice of steel tube types, design calculation, fabrication and installation, are listed on the basis of retrofit experiences gained with superheaters and reheaters of two 350 MW boiler sets.
出处
《发电设备》
2005年第5期302-304,共3页
Power Equipment