根据《飞云江河口航运规划》提出的整治工程方案,结合以往研究成果,对整治工程进行了数学模型计算和物理模型试验。基于综合整治效果及工程量等因素的考虑,通过比较,推荐方案七和方案五作为飞云江河口综合整治工程方案。
The mathematical model calculations and physical model studies on the navigation channel rehabilitation are carried out according to the schemes of Feiyun River Estuary Navigation Channel Planning, and integrated with research results acquired before. Based on the comprehensive rehabilitation effect and engineering work, the Seventh Scheme and the Fifth Scheme are recommended as the comprehensive schemes of the navigation channel rehabilitation.
出处
《中国农村水利水电》
北大核心
2005年第9期13-17,共5页
China Rural Water and Hydropower
关键词
飞云江
航道整治
工程方案优选
Feiyun River
navigation channel rehabilitation
project scheme selection