摘要
根据铁路信号计算机联锁设备施工不能影响铁路正常行车的要求,我们精心组织,合理安排施工方案,达到了预期效果。
Railway signal micro-computers are interlocked. According to the requirement that railway operation can not be affected by computer replacement. We were meticulous in organization, reasonably arranged to implement contruction plan, which got the anticipated result.
出处
《机械管理开发》
2005年第5期82-82,85,共2页
Mechanical Management and Development
关键词
采集条件
微机调试
转线施工
Gathering condition Micro-computer adjusting and test Wire change construction