摘要
针对变电站房屋在运行过程中出现的如墙体、楼板等的裂缝,从温度变形、基础不均匀沉降、特殊砌体材料等多方面,对其裂缝的成因作了分析,并提出一些具体的防治措施。
According to cracks in wall and floor-slab during operation, it analyzes its cause from temperature deformation/non-uniform sedimentation of foundation/special brick materials, and specific prevention measures are putted forward.
出处
《山西建筑》
2005年第19期109-110,共2页
Shanxi Architecture
关键词
变电站
裂缝
设计
材料
混凝土配合比
substation, crack, design, material, proportion of concrete