期刊文献+

间歇过程滑动窗口子时段PCA建模和在线监测 被引量:6

Sub-stage PCA Modeling and On-line Monitoring with Moving Windows for Batch Processes
下载PDF
导出
摘要 针对在短期内不容易获得充足建模数据的间歇工业过程,提出一种间歇过程监视方法,该方法只需要一次正常间歇操作数据,利用滑动窗口,进行子时段划分、建立初始主元分析(PCA)监测模型,同时提出了基于子时段PCA模型的在线监测算法和一种模型更新策略.通过在注塑过程的成功应用,表明了所提出方法的可行性和有效性. For batch processes with difficulties in collecting sufficient data in limited time,a batch monitoring method is proposed. The proposed method uses a single normal batch reference data and moving windows to divide sub-stage and builds an initial PCA monitoring model, The on-line monitoring method and method updating the model are proposed. The application to an injection molding process shows the effectiveness and feasibility of the proposed method for batch industry.
出处 《控制与决策》 EI CSCD 北大核心 2005年第9期1034-1037,共4页 Control and Decision
基金 国家自然科学基金项目(60374003)
关键词 间歇过程监测 主元分析 多时段建模 注塑过程 Batch process monitoring Principal component analysis Multi-stage modeling Injection molding process
  • 相关文献

参考文献6

  • 1Nomikos P, MacGregor J F. Monitoring of Batch Processes Using Multi-way Principal Component Analysis[J]. AIChE J, 1994,40(8):1361-1375.
  • 2Nomikos P, MacGregor J F. Multivariate SPC Charts for Monitoring Batch Processes[J]. Technometrics, 1995,37(1):41-59.
  • 3Undey C, Cinar A. Statistical Monitoring of Multistage, Multiphase Batch Processes[J]. IEEE Control Systems Magazine, 2002,22(10): 40-52.
  • 4Kourti T. Multivariate Dynamic Data Modeling for Analysis and Statistical Process Control of Batch Processes, Start-ups and Grade Transitions[J]. J Chemometrics, 2003,17(1):93-109.
  • 5Lu N Y, Gao F R, Wang F L. A Sub-PCA Modeling and On-line Monitoring Strategy for Batch Processes[J]. AIChE J, 2004,50(1):255-259.
  • 6Johnson R A, Wichern D W. Applied Multivariate Statistical Analysis[M]. New York: Prentice Hall, 2002.

同被引文献74

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部