拱坝运行期坝肩变形对岸坡溢洪道受力影响的有限元法分析

Finite element method analysis for influence of arch dam abutment to bank spillway stressing in operating period
下载PDF
导出
摘要 通过有限元计算,分析龙泉市岩樟溪一级电站拦河坝在最不利工况时对岸坡溢洪道结构的应力和稳定的影响。根据计算成果,认为在采取溢洪道底板和侧墙加插锚筋后,正常的坝肩变形不会对溢洪道结构的应力和稳定造成危害。 Throngh finite element method calculation, we analyse the stress and stability of the bank spillway concrete structure in bad conditions for the dam of Yanzhangxi ( 1 ) Water Power Station in Longquan. Based on the computation result, we think that a normal abutment deformation will not create danger to the stress and stability of the spimway concrete structure after adding the spillway base plate and anchor bar in the flank wall.
出处 《浙江水利科技》 2005年第5期13-15,共3页 Zhejiang Hydrotechnics
关键词 拱坝 坝肩变形 岸边正槽溢洪道 受力影响 有限元分析 arch dam dam abutment deformation bank spillway stressing influence finite dement analysis
  • 相关文献

参考文献3

二级参考文献4

  • 1.SL253—2000.溢洪道设计规范[s].,2000..
  • 2.SL253-2000.溢洪道设计规范[S].,..
  • 3刘德富 罗先启.龙滩水电站表孔预应力闸墩三维有限元分析研究.人民长江,1996,(8):1-4.
  • 4王炎廷,罗先启,杨学堂.古洞口溢洪道闸室结构三维有限元分析[J].武汉水利电力大学(宜昌)学报,1997,19(4):67-71. 被引量:2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部