期刊文献+

盾构法隧道工程施工的定向测量 被引量:2

Directional Survey Technology of Shield-driven Tunneling Technique for Yangtze River Pipeline Crossing of West-to-East Gas Transmission Pipeline Project
下载PDF
导出
摘要 介绍了在红花套长江穿越盾构隧道施工中所采用的泥水加压平衡式盾构法施工工艺。针对盾构法施工的特点,进行了测量贯通误差分析,通过对各种测量方案的比选,提出了采用联系三角形定向测量法进行竖井定向测量的技术方案,为今后类似工程提供了科学依据。 In the paper, the shield-driven tunneling technique used in Honghuatao pipeline crossing in Yangtze River for West-to-East Gas Transmission Pipeline Project is introduced. In the light of this technique ' s characteristics,the analysis on the survey pass-through error is made. According to the comparison results of different survey programs, the tying triangle directional survey program is presented to directionally survey the vertical shaft and is successfully applied to this pipeline project.
出处 《油气储运》 CAS 北大核心 2005年第9期31-33,共3页 Oil & Gas Storage and Transportation
关键词 管道穿越 盾构法隧道施工 定向测量 应用 盾构法施工 隧道工程施工 施工工艺 泥水加压 隧道施工 误差分析 pipeline crossing,shield-driven tunneling technique,directional survey technology
  • 相关文献

同被引文献33

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部