期刊文献+

高喷桩基在大风江调水工程中的应用

Application of high pressure gunite technique in pile foundation construction of Dafengjiang water control project
下载PDF
导出
摘要 介绍了大风江调水工程中的东场挡潮闸工程的基础及工程地质情况,分析了闸址地层岩性,提出了采用高压喷射灌浆技术形成较大直径桩基,提高挡潮闸两岸岸墙砂基础的地基承载力,并详细论述了高喷桩的设计、施工和质量控制。 An introduction is made on the foundation and engineering geological conditions of Dongchang tide gates, a component of Dafengjiang water control project. Based on an analysis on the lithologic character of gate site strata, high pressure gunite technique is adopted for the construction of pile foundation with large diameter, so as to improve the foundation bearing capacity of quay wall sand foundation at both sides of tide gates. A detailed introduction is made on the design, construction and quality control of high pressure gunite pile.
出处 《广西水利水电》 2005年第3期24-27,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 挡潮闸 岸墙 砂基础 高压喷射灌浆 大直径桩基 Tide gate quay wall sand foundation high pressure gunite pile foundation with large diameter
  • 相关文献

参考文献1

  • 1广西水利电力勘测设计研究院.大风江调水工程初步设计报告[R].南宁:广西水利电力勘测设计研究院,2003..

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部