从合面狮电厂多年运行情况看,汛期产生大最弃水,且利用水头尚有潜力可挖,为此。
From the perennial running situation of Henianshi hydropower plant,it produces a lot of abandoned water in flood,period,and the used water head has potentialities,so a suggestion to get an additional generator set for regulating peak load has been put forward in this paper.
出处
《广西水利水电》
1996年第2期50-53,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
水力发电厂
调峰
机组
容量
梧州市
additional eracting,regulating peak load.,generator set,capacity