摘要
介绍高墩56m简支箱梁桥采用节段拼装法施工过程中预制梁段的就位、造桥机拼装和箱梁线形控制等技术,施工结果表明具有良好的效果和推广价值。
In this article, authors state some techniques adopted in construction of a 56 meters long simple support high pier box beam bridge with the segment assembly method such as insertion of pre-manufactured beam members, assembly of the bridge building machine, and control of curve of the box beam and so on. Construction result indicates that this method has good effect and application value.
出处
《施工技术》
CAS
北大核心
2005年第9期1-3,共3页
Construction Technology
基金
上海铁路局科技研究开发项目(2003J23)
关键词
桥梁工程
移动支架
造桥机
56m箱梁
施工控制
bridge engineering
shifting frame
bridge building machine
56 meters long box beam
construction control