索风营水电站引水发电系统地下硐室群施工期安全监测 被引量:1

Safety monitoring on underground chambers and tunnels for Suofengying Hydropower Station during construction
下载PDF
导出
摘要 介绍索风营水电站引水发电系统地下硐室群的施工期安全监测状况,对监测成果进行了整理与分析,分析评价了分层开挖施工过程与硐室围岩变形监测成果的影响因素关系,与其他已建工程的监测资料进行对比分析,对索风营水电站地下厂房的围岩稳定性作了初步评价。 The safety monitoring on the construction of the underground chambers and tunnels for the power house and the appurtenant works of Suofengying Hydropower Station is presented herein, in which the monitoring data are classified and analyzed; the relationship between the construction of the excavation in layers and the monitoring data from the deformation of the surrounding rock of the both the chambers and tunnels is evaluated with the comparative analysis on the monitoring data between this project and the other existed projects, and then the preliminary evaluation on the stability of the surrounding rock for the underground works of the hydropower station is made as well.
出处 《水利水电技术》 CSCD 北大核心 2005年第9期37-41,共5页 Water Resources and Hydropower Engineering
关键词 引水发电系统 地下硐室群 安全监测 索风营水电站 贵州省 地下厂房 硐室群 施工期 监测成果 围岩稳定性 water diversion and power generation system underground chambers and tunnels safety monitoring Suofengying Hydropower Station Guizhou Province
  • 相关文献

同被引文献2

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部