期刊文献+

广东中山临海工业园防潮防洪及竖向设计探讨 被引量:4

Approach to Damp-Proof and Flood Control and Vertical Design of Zhongshan Linhai Industrial Park in Guangdong Province
下载PDF
导出
摘要 广东中山临海工业园为国家火炬计划临海装备制造产业基地,其东、西、北三面临靠横门水道,南望珠江入海口,面积约20km2。该文介绍该基地的规划原则、防潮防洪体系的标准和确定以及设计水位和堤顶高程的计算。 Zhongshan Linhai Industrial Park in Guangdong Province is the base of Linhai equipment manufacture industry of the state torch plan. It faces on Hengmen Watercourse in three directions, i.e. east, west and north. It also gazes out at entrance into the sea of the Zhujiang River in south with an area of 20km2. The paper introduces the planning principle of the base, the standards and determination of damp-proof and flood control system as well as the calculation of the design level and embankment top elevation.
作者 钱光
出处 《城市道桥与防洪》 2005年第5期86-87,共2页 Urban Roads Bridges & Flood Control
关键词 城市规划 竖向设计 防潮防洪 堤顶高程 中山市 工业园区 urban planning, vertical design, damp-proof and flood control, embankment top elevation, Zhongshan City, industrial park area
  • 相关文献

同被引文献23

  • 1张绍园.排水管网设计中最优方案的探讨──与彭永臻同志商榷[J].中国给水排水,1994,10(2):32-34. 被引量:10
  • 2周琦,禹华谦.改进的“两相优化法”在排水管网优化设计中的应用[J].工业安全与环保,2006,32(3):46-48. 被引量:5
  • 3戴慎志.城市工程系统规划[M].北京:中国建筑工业出版社,2000.
  • 4American Society of Civil Engineers,Canadian Society of Civil Engineering and Institute of Civil Engineers.Planning and the Civil Engineer[M].London:Thomas Telford Limited,1982.
  • 5郭功佺.给水排水工程概预算与经济评价手册[K].北京:中国建筑工业出版社,1996.
  • 6戴慎志,陈践.城市给水排水工程规划[M].合肥:安徽科学技术出版社,2001.
  • 7河海大学.南沙区风暴潮专题研究及防洪标高论证技术报告[R].南京:河海大学,2014.
  • 8珠江水利委员会.珠水规计函[2011]312号关于发送珠江三角洲主要测站设计潮位复核成果协调会会议纪要的函[Z].2011.
  • 9珠江水利委员会.珠江流域综合规划(2012--2030年)[R].广州:水利部珠江水利委员会,2013.
  • 10广东省水利厅.广东省流域综合规划总报告(2012--2030年)[R].广州:广东省水利厅,2014.

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部